咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Experimental research and nume... 收藏

Experimental research and numerical simulation of the multi-field performance of cemented paste backfill:Review and future perspectives

Experimental research and numerical simulation of the multi-field performance of cemented paste backfill:Review and future perspectives

作     者:Yong Wang Zhenqi Wang Aixiang Wu Liang Wang Qing Na Chen Cao Gangfeng Yang Yong Wang;Zhenqi Wang;Aixiang Wu;Liang Wang;Qing Na;Chen Cao;Gangfeng Yang

作者机构:School of Civil and Resource EngineeringUniversity of Science and Technology BeijingBeijing 100083China State Key Laboratory for GeoMechanics and Deep Underground EngineeringChina University of Mining&Technology(Beijing)Beijing 100083China ZHONGGUANCUN Green Mine Industry AllianceBeijing 100083China 

出 版 物:《International Journal of Minerals,Metallurgy and Materials》 (矿物冶金与材料学报(英文版))

年 卷 期:2023年第30卷第2期

页      面:193-208页

核心收录:

学科分类:081901[工学-采矿工程] 0819[工学-矿业工程] 08[工学] 0818[工学-地质资源与地质工程] 

基  金:financially supported by the National Natural Science Foundation of China(No.52130404) the State Key Laboratory for GeoMechanics and Deep Underground Engineering China University of Mining&Technology,Beijing(No.SKLGDUEK2127) the Fundamental Research Funds for the Central Universities(Nos.FRF-TP-19-002C2Z,FRF-IDRY-20-031) and the Fundamental Research Funds for the Central Universities and the Youth Teacher International Exchange&Growth Program(No.QNXM20220002)。 

主  题:cemented paste backfill multi-field performance in situ mathematic model numerical simulation 

摘      要:Cemented paste backfill(CPB)technology is a green mining method used to control underground goaves and tailings ponds.The curing process of CPB in the stope is the product of a thermo-hydro-mechanical-chemical multi-field performance interaction.At present,research on the multi-field performance of CPB mainly includes indoor similar simulation experiments,in-situ multi-field performance monitoring experiments,multi-field performance coupling model construction of CPB,and numerical simulation of the multi-field performance of CPB.Because it is hard to study the in-situ multi-field performance of CPB in the real stope,most current research on in-situ multi-field performance adopts the numerical simulation method.By simulating the conditions of CPB in the real stope(e.g.,maintenance environment,stope geometry,drainage conditions,and barricade and backfilling rates),the multi-field performance of CPB is further studied.This paper summarizes the mathematical models employed in the numerical simulation and lists the engineering application cases of numerical simulation in the in-situ multi-field performance of CPB.Finally,it proposes that the multi-field performance of CPB needs to strengthen the theoretical study of multi-field performance,form the strength design criterion based on the multi-field performance of CPB,perform a full-range numerical simulation of the multi-field performance of CPB,develop a pre-warning technology for the CPB safety of CPB,develop automatic and wireless sensors for the multi-field performance monitoring of CPB,and realize the application and popularization of CPB monitoring technology.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分