咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >SCC-UEFAS, an urban-ecological... 收藏

SCC-UEFAS, an urban-ecological-feature based assessment system for sponge city construction

作     者:Zi-Tong Zhao Hou-Ming Cheng Sheng Wang Hai-Yan Liu Zi-Ming Song Jun-Hui Zhou Ji-Wei Pang Shun-Wen Bai Shan-Shan Yang Jie Ding Nan-Qi Ren 

作者机构:State Key Laboratory of Urban Water Resource and EnvironmentHarbin Institute of TechnologyHarbin150000China Central&Southern China Municipal Engineering Design and Research Institute Co.LtdWuhan430010China China Energy Conservation and Environmental Protection GroupBeijing100089China 

出 版 物:《Environmental Science and Ecotechnology》 (环境科学与生态技术(英文))

年 卷 期:2022年第12卷第4期

页      面:8-17页

核心收录:

学科分类:02[经济学] 0202[经济学-应用经济学] 0830[工学-环境科学与工程(可授工学、理学、农学学位)] 

基  金:financial support from the National Key Research and Development Program of China(Grant No.2019YFD1100204) The National Natural Science Foundation of China(52170073) The State Key Laboratory of Urban Water Resource and Environment,Harbin Institute of Technology(No.2021TS03)。 

主  题:Sponge city evaluation system Principal component analysis Factor analysis Variable weight theory 

摘      要:An effective sponge city construction evaluation system plays a crucial role in evaluating sponge city construction schemes.The construction of a sponge city evaluation system still faces challenges related to incomplete index selection and unscientific weight division.Limited studies have focused on the comprehensive assessment of sponge city construction in the early stages.This study constructed a scientific assessment indicator system and a quantitative indicator weight at all levels by literature review and statistical analysis methods from an objective perspective.To demonstrate how to utilize our evaluation methods,three construction schemes randomly generated by MATLAB were evaluated under evaluation states of constant weight and variable weight,respectively.Scheme 3 had the highest score of 0.638 under the constant weight assessment,but it cannot practically be the final construction scheme due to the imbalance between indicators.Compared to the constant weight assessment,a variable weight assessment can effectively balance the states of the evaluation index with changes in the decision variable.Among the three schemes,Scheme 2 is the best choice with a value of 0.0355 under variable weight evaluation due to punishment and incentives in the variable weight method.The concept of“punishinga disadvantageous indicator and“motivatingan advantageous indicator increases the relative advantages of the indices,ultimately affecting the assessment results of schemes and leading to a more balanced state.This study provides reasonable analysis and decision-making mechanisms to support decision-making and guide the scientific selection of a construction scheme.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分