咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Genetic Algorithm for Scheduli... 收藏

Genetic Algorithm for Scheduling Problem of Chemical Batch Process with Due Date Constraints

Genetic Algorithm for Scheduling Problem of Chemical Batch Process with Due Date Constraints

作     者:SONG Jie-wei, RONG Gang (National Key Laboratory of Industrial Control Technology, Zhejiang U niversity, Hangzhou 310027, China) 

出 版 物:《厦门大学学报(自然科学版)》 (Journal of Xiamen University:Natural Science)

年 卷 期:2002年第41卷第S1期

页      面:147-页

核心收录:

学科分类:12[管理学] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 07[理学] 070105[理学-运筹学与控制论] 0701[理学-数学] 

主  题:batch process earliness and tardiness genetic a lgorithms hold cost intermediate storage JIT scheduling 

摘      要:The intense competition in the current marketplace ha s forced firms to reexamine their methods of doing business, using superior manu facturing practices in the form of just-in-time (JIT), production with JIT pra ctices pursue completion on time and zero inventory, which is often instruct ed according to the custom’s demand or the sale contract. Earliness and tardine ss are undesirable because both of them will bring the extra cost, cost will als o be increased by some factors such as operation condition, intermediate storage , clean method, etc, to minimize the total cost is often the main scheduling objective, but sometime it is most important for factories to eliminate the tar diness cost in order to maintain the commercial credit and to avoid penalty, the refore, minimum of tardiness cost becomes the first objective. It is more import ant to select a reasonable objective by the actual condition during scheduli ng. In this paper scheduling problem of chemical batch process with due date is studied, two different intermediate storage policies and two different productio n modes are also discussed, production scheduling with different intermediate st orage policy and different production mode is proposed and the result is compare d. In order to complete all products within the due date, not only earliness and tardiness but also holding problem is considered, the objective is to selec t a proper intermediate storage policy and production mode and to minimize the c ost resulted by the earliness and tardiness, even the cost result by the interme diate storage. Scheduling with multiple stage and multiple machine is known as a NP-hard problem, mathematical program (MP) method, such as branch-and-bound (BAB), mixed integer linear program (MILP), etc, is often used to solve the sche duling problem. But as is well known, MP method is not good for combination opti mization, especially for large scale and complex optimal problem, whereas geneti c algorithm (GA) can overcome

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分