咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Sizing and Siting of Battery E... 收藏

Sizing and Siting of Battery Energy Storage Systems:A Colombian Case

Sizing and Siting of Battery Energy Storage Systems: A Colombian Case

作     者:Alvaro Avendano Pena David Romero-Quete Camilo A.Cortes Alvaro Avenda?o Pe?a;David Romero-Quete;Camilo A.Cortes

作者机构:Department of Electrical and Electronics EngineeringUniversidad Nacional de ColombiaBogotaColombia 

出 版 物:《Journal of Modern Power Systems and Clean Energy》 (现代电力系统与清洁能源学报(英文))

年 卷 期:2022年第10卷第3期

页      面:700-709页

核心收录:

学科分类:081504[工学-水利水电工程] 0808[工学-电气工程] 08[工学] 0815[工学-水利工程] 

基  金:supported by the Grupo Energia Bogotá,within Agreement 101858-2019 between GEB and CEIBA foundation by Minciencias,with the postdoctoral scholarship program 848-2019。 

主  题:Battery energy storage curtailment sizing and siting renewable energy 

摘      要:This paper presents a mixed-integer linear programming(MILP)formulation for sizing and siting of battery energy storage systems(BESSs).The problem formulation seeks to minimize both operation costs and BESS investment.The proposed model includes restrictions of the conventional securityconstrained unit commitment problem,a piece-wise linear approximation to model power losses,and a linear model of hydro generation units.The proposed model is tested in a 6-bus test system and a 15-bus system representing the Colombian power system.For the two studied systems,simulation results show that the reduction of operation costs due to the installation of BESSs compensates the investments,under some of the considered technical cost cases.Additionally,results show that adequate sizing and siting of BESSs reduce renewable energy curtailment in the Colombian power system with high penetration of fluctuating renewable generation.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分