文献详情 >Using Interim Recommitment to ... 收藏

Using Interim Recommitment to Reduce the Operational-cost Impacts of Wind Uncertainty

Using Interim Recommitment to Reduce the Operational-cost Impacts of Wind Uncertainty

作     者:Mahan A.Mansouri Ramteen Sioshansi Mahan A.Mansouri;Ramteen Sioshansi

作者机构:Department of Integrated Systems EngineeringThe Ohio State UniversityColumbusOH 43210USA Department of Integrated Systems EngineeringDepartment of Electrical and Computer Engineeringand Center for Automotive ResearchThe Ohio State UniversityColumbusOH 43210USA 

出 版 物:《Journal of Modern Power Systems and Clean Energy》 (现代电力系统与清洁能源学报(英文))

年 卷 期:2022年第10卷第4期

页      面:839-849页

核心收录:

学科分类:08[工学] 0807[工学-动力工程及工程热物理] 

基  金:This work was supported by National Science Foundation(No.1808169) 

主  题:Power-system operation power-system economics unit commitment economic dispatch wind generation. 

摘      要:Using wind-availability forecasts in day-ahead unit commitment can require expensive real-time operational *** examine the benefit of conducting interim recommitment between day-ahead unit commitment and real-time *** a simple stylized example and a case study that is based on ISO New England,we compare system-operation costs with and without interim *** find an important tradeoff—later recommitment provides better wind-availability forecasts,but the system has less flexibility due to operating *** the time windows that we examine,hour-20 recommitment provides the greatest operational-cost reduction.