咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Bilateral Contract for Load Fr... 收藏

Bilateral Contract for Load Frequency and Renewable Energy Sources Using Advanced Controller

作     者:Krishan Arora Gyanendra Prasad Joshi Mahmoud Ragab Muhyaddin Rawa Ahmad H.Milyani Romany F.Mansour Eunmok Yang 

作者机构:School of Electronics and Electrical EngineeringLovely Professional UniversityPhagwara144001PunjabIndia School of Department of Computer Science and EngineeringSejong UniversitySeoul05006Korea Information Technology DepartmentFaculty of Computing and Information TechnologyKing Abdulaziz UniversityJeddah21589Saudi Arabia Centre for Artificial Intelligence in Precision MedicinesKing Abdulaziz UniversityJeddah21589Saudi Arabia Mathematics DepartmentFaculty of ScienceAl-Azhar UniversityNaser City11884CairoEgypt Center of Research Excellence in Renewable Energy and Power SystemsKing Abdulaziz UniversityJeddah21589Saudi Arabia Department of Electrical and Computer EngineeringFaculty of EngineeringKing Abdulaziz UniversityJeddah21589Saudi Arabia King Abdullah City for Atomic and Renewable Energy(K.A.CARE)RiyadhSaudi Arabia Department of MathematicsFaculty of ScienceNew Valley UniversityEl-Kharga72511Egypt Department of Information SecurityCryptologyand MathematicsKookmin UniversitySeoul02707Korea 

出 版 物:《Computers, Materials & Continua》 (计算机、材料和连续体(英文))

年 卷 期:2022年第73卷第11期

页      面:3165-3180页

核心收录:

学科分类:08[工学] 0812[工学-计算机科学与技术(可授工学、理学学位)] 

基  金:The Deanship of Scientific Research(DSR)at King Abdulaziz University Jeddah Saudi Arabia has funded this project under grant no.(FP-221-43) 

主  题:Bilateral contract load frequency control optimization harris hawks optimizer 

摘      要:Reestablishment in power system brings in significant transformation in the power sector by extinguishing the possession of sound consolidated ***,the collaboration of various manufacturing agencies,autonomous power manufacturers,and buyers have created complex installation *** regular active load and inefficiency of best measures among varied associates is a huge *** sudden load deviation will give rise to immediate amendment in frequency and tie-line power *** is essential to deal with every zone’s frequency and tie-line power within permitted confines followed by fluctuations within the ***,it can be proficient by implementing Load Frequency Control under the Bilateral case,stabilizing the power and frequency distinction within the interrelated power *** the net deviation in multiple areas is possible by minimizing the unbalance of Bilateral Contracts with the help of proportional integral and advanced controllers like Harris Hawks *** proposed the advanced controller Harris Hawk optimizer-based model and validated it on a test *** experiment results show that the delay time is 0.0029 s and the settling time of 20.86 s *** model can also be leveraged to examine the decision boundaries of the Bilateral case.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分