咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Application of New Water Flood... 收藏

Application of New Water Flooding Characteristic Curve in the High Water-Cut Stage of an Oilfield

作     者:Xi Zhang Changquan Wang Hua Wu Xu Zhao 

作者机构:School of Petroleum EngineeringYangtze UniversityWuhan430100China Exploration and Development Research Institute of Jianghan Oilfield Company of SinopecWuhan430223China 

出 版 物:《Fluid Dynamics & Materials Processing》 (流体力学与材料加工(英文))

年 卷 期:2022年第18卷第3期

页      面:661-677页

核心收录:

学科分类:081803[工学-地质工程] 08[工学] 0818[工学-地质资源与地质工程] 

基  金:It is supported by the National Natural Science Foundation of China(No.51404037) supported by the Scientific and Technological Research Project of Sinopec Jianghan Oilfield Branch Company(No.ZKK0220006) 

主  题:Water flooding characteristic curve high water cut period production dynamic prediction recoverable reserves water flooding 

摘      要:The oil production predicted by means of the conventional water-drive characteristic curve is typically affected by large deviations with respect to the actual value when the so-called high water-cut stage is *** order to solve this problem,a new characteristic relationship between the relative permeability ratio and the average water saturation is *** comparing the outcomes of different matching methods,it is verified that it can well reflect the variation characteristics of the relative permeability ratio *** the new formula with a reservoir engineering method,two new formulas are derived for the water flooding characteristic curve in the high water-cut *** practicability is verified by using the production data of Mawangmiao and Xijiakou *** results show that the error between the predicted cumulative oil production and production data of the two new water drive characteristic curves is less than the error between the B-type water drive characteristic curve and the other two water drive characteristic *** is concluded that the two new characteristic curves can be used to estimate more accurately the recoverable reserves,the final recovery and to estimate the effects of water flooding.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分