Discussion on blasting vibration monitoring for rock damage control in rock slope excavation
爆炸的讨论颤动在岩石斜坡挖掘为岩石损坏控制监视作者机构:School of Civil Engineering and ArchitectureNanchang UniversityNanchang 30031China School of Resource and Environmental EngineeringJiangxi University of Science and TechnologyGanzhou 341000China
出 版 物:《Earthquake Engineering and Engineering Vibration》 (地震工程与工程振动(英文刊))
年 卷 期:2022年第21卷第1期
页 面:53-65页
核心收录:
学科分类:08[工学] 0815[工学-水利工程] 081503[工学-水工结构工程]
基 金:National Natural Science Foundation of China under Grant Nos.51969015 and U1765207 Jiangxi Provincial Natural Science Foundation under Grant Nos.20192ACB21019 and 20204BCJ23002
主 题:rock slope blasting excavation vibration rock damage
摘 要:Drill and blast is a commonly used method for rock slope excavation in hydropower *** blasting excavation of rock slopes,far-field vibration monitoring on the first upper berm for statutory compliance is usually performed to control the blast-induced rock damage to the final slope *** this study,for the rock slope excavation in the Jinping-I hydropower station,the field vibration monitoring and acoustic testing are presented to investigate the vibration characteristics on the first upper berm and the damage depth in the current *** relationship between the PPV on the first upper berm and the PPV damage threshold on the damage zone boundary is also studied through three-dimensional FEM *** results show that on the first upper berm,the maximum vibration velocity component occurs in the vertical *** on the blasting damage zone boundary,the horizontal radial vibration velocity is the maximum *** the Jinping-I slope with a bench height of 30 m,the radial PPV on the inner side of the first upper berm is 2.06%of the PPV threshold on the damage zone *** ratio is increased as the bench height ***,the bench height of the rock slope is an important factor that cannot be ignored in determining the allowable vibration velocity for rock damage control.