Current Status of the KSTAR Engineering
Current Status of the KSTAR Engineering作者机构:Korea Basic Science Institute 52 Yeoeun-Dong Yusung-Ku Daejeon 305-333 KoreaKorea Basic Science Institute 52 Yeoeun-Dong Yusung-Ku Daejeon 305-333 KoreaKorea Basic Science Institute 52 Yeoeun-Dong Yusung-Ku Daejeon 305-333 KoreaKorea Basic Science Institute 52 Yeoeun-Dong Yusung-Ku Daejeon 305-333 KoreaKorea Basic Science Institute 52 Yeoeun-Dong Yusung-Ku Daejeon 305-333 KoreaKorea Basic Science Institute 52 Yeoeun-Dong Yusung-Ku Daejeon 305-333 KoreaKorea Basic Science Institute 52 Yeoeun-Dong Yusung-Ku Daejeon 305-333 KoreaKorea Basic Science Institute 52 Yeoeun-Dong Yusung-Ku Daejeon 305-333 KoreaKorea Basic Science Institute 52 Yeoeun-Dong Yusung-Ku Daejeon 305-333 Korea
出 版 物:《Plasma Science and Technology》 (等离子体科学和技术(英文版))
年 卷 期:2004年第6卷第1期
页 面:2159-2165页
核心收录:
学科分类:07[理学] 070204[理学-等离子体物理] 0702[理学-物理学]
基 金:the Korean Ministry of Science and Technology under the KSTAR project contract
主 题:KSTAR tokamak vacuum vessel magnet cryostat tokamak assembly
摘 要:As there is substantial progress in the KSTAR tokamak engineering, all themajor structures and sub-systems are under fabrication and in procurement phase. The vacuum vessel,port, cryostat cylinder, lid, and bellows are being rigorously fabricated in the factory. The lowerpart of the KSTAR such as cryostat base and gravity support has been almost finished in itsfabrication. There are also great progresses and significant results in manufacturing of thesuperconducting magnet, including four Toroidal Field (TF) coils, lower and upper PF7 coils whichare the largest Poloidal Field (PF) coils. The TFOO coil, which has been made for test and back-upof the TF magnet system, was successfully tested in the cool-down and current charging. As thefabrications and procurements of major structures have been actively proceeded, assembly works werealso launched from Aug. 2003. More detailed description on these status, results, and plans will bedescribed in this paper.