文献详情 >Strategic sill pillar design f... 收藏

Strategic sill pillar design for reduced hanging wall overbreak in longhole mining

Strategic sill pillar design for reduced hanging wall overbreak in longhole mining

作     者:Tuo Chen Hani S.Mitri Tuo Chen;Hani S.Mitri

作者机构:Department of Mining and Materials EngineeringMc Gill UniversityMontrealQuebec H3A 0E8Canada 

出 版 物:《International Journal of Mining Science and Technology》 (矿业科学技术学报(英文版))

年 卷 期:2021年第31卷第5期

页      面:975-982页

核心收录:

学科分类:081901[工学-采矿工程] 0819[工学-矿业工程] 08[工学] 

基  金:financially supported by the Natural Science and Engineering Research Council(NSERC)-Discovery Grants Program 

主  题:Underground mine design Longitudinal mining Sill pillar design Unplanned ore dilution Numerical modelling 

摘      要:Steeply dipping,vein and tabular orebodies are traditionally extracted with longitudinal retreat mining methods such as Eureka and Avoca in a bottom-up sequence with delayed *** increase productivity,sill pillars in the orebody are used to separate mining zones thus allowing production to take place simultaneously in two or more *** such mining methods are productive,they may be accompanied with high volumes of hanging wall overbreak causing significant unplanned ore *** this work,it is shown through a mine design case study of a narrow vein deposit that a sill pillar could also play a significant role in limiting hanging wall *** demonstrate the role of sill pillar,a novel numerical modelling scheme is proposed to account for progressive stope wall overbreak.A numerical modelling approach of element death and rebirth is developed to allow for the detected stope overbreak to be immediately removed and replaced with backfill material before upper-level stope *** is further shown that the average overbreak volume could be reduced by as much as 33%when the sill pillar is strategically placed in the lower half of a mine plan.