Assessment of Relationship of Some Causal Factors Associated with Productivity of Longwall Mining Using Structured Equation Modeling

Assessment of Relationship of Some Causal Factors Associated with Productivity of Longwall Mining Using Structured Equation Modeling

作     者:Sidharth Talan Ashis Bhattacherjee Sidharth Talan;Ashis Bhattacherjee

作者机构:Trafigura Mumbai India Mining Engineering Department Indian Institute of Technology Kharagpur India 

出 版 物:《Journal of Minerals and Materials Characterization and Engineering》 (矿物质和材料特性和工程(英文))

年 卷 期:2021年第9卷第4期

页      面:375-389页

学科分类:08[工学] 0802[工学-机械工程] 

主  题:Structured Equation Modelling Longwall Mining Operational Equipment Productivity 

摘      要:Enhancement of productivity optimization is steadily gaining the priority in mining companies especially in the underground coal mining industry which faces a daunting task to balance marginal profit generation with a comparatively high cost of production, volatile market price and rapid grade variation. This paper is aimed to analyze some of the causal factors both technical and site specific which are directly or indirectly impacting the productivity of the longwall coal mining system such as downtime of equipment system in longwall panel, overloading of conveyors and bin, preventive maintenance, gas management practices and injury severity rate. Structured Equation Modelling (SEM) was used to study the causal relationships between the above-mentioned factors and mine productivity. The equipment considered for analysis included shearer, armored face conveyor, crusher, bridge stage loader, chock supports, main gate drive, gate conveyor, hydraulic pumps and crusher. SEM was applied to relate the correlations existing among these causal variables in order to assess their direct or indirect impact on mining productivity. Based on the data extracted over a period of 10 months which included the extraction of 2 longwall panels, the study revealed a significant negative causal relationship between injury severity rate (p 0.01) and equipment downtime (p = 0.001), with mine productivity. However, preventive maintenance delay time, gas management delay time and conveyor overloading delay time were found to have an insignificant direct influence on mine productivity but indirectly modify it through a significant mediator relationship with equipment downtime. This information would assist mine management to take proper preventive measures.