Deployment and Exploration of a Gas Storage Well Pattern Based on the Threshold Radius
基于阀值半径的一个煤气的存储井模式的推广和探索作者机构:University of Science and Technology BeijingBeijing 100083China Research Institute of Petroleum Exploration and DevelopmentCNPCBeijing 100083China Petro China Liaohe Oilfield CompanyPanjinLiaoning 124000China Petro China Tarim Oilfield CompanyKorlaXinjiang 841000China Petro China Southwest Oil and Gas Field CompanyChongqing 401121China
出 版 物:《Acta Geologica Sinica(English Edition)》 (地质学报(英文版))
年 卷 期:2021年第95卷第2期
页 面:630-637页
核心收录:
学科分类:0820[工学-石油与天然气工程] 080706[工学-化工过程机械] 08[工学] 0807[工学-动力工程及工程热物理] 082003[工学-油气储运工程]
基 金:granted by the National Key Research and Development Project grant number 2017YFC0805801 the Chinese Academy of Engineering Major Consulting Project grant number 2017-ZD-03
主 题:gas storage well deployment strategy gas injection well pattern gas production well pattern threshold radius
摘 要:To tackle the problem that wells that are deployed in a specific pattern based on the requirements of gas reservoir development are not suitable for gas storage,we have conducted concentrically circular injection and production simulation experiments for gas storage,discovered the existence of a threshold radius,denoted by Rt,and derived the expression for *** on the analysis and discussion results,we propose a strategy for deploying gas storage wells in specific *** expression for Rt shows that it is affected by factors such as the gas storage gas production/injection time,the upper pressure limit,the lower pressure limit,the bottomhole flow pressure at the ends of injection and production,the and *** analysis and discussion results show that the Rt of a gas storage facility is much smaller than the Rt for gas reservoir *** the gas storage facilities in China,the Rt for gas production is less than the Rt for the gas injection,and Rt increases with the difference in the operating pressure and with permeability *** on the characteristics of Rt,we propose three suggestions for gas storage well pattern deployment:(1)calculate Rt according to the designed functions of the gas storage facility and deploy the well pattern according to Rt;(2)deploy sparser,large-wellbore patterns in high-permeability areas and denser,small-wellbore patterns in high-permeability areas;and(3)achieve the gas injection well pattern by new drilling,and the gas production well pattern through a combination of the gas injection well pattern and old *** assessing a gas storage facility with a perfect well pattern after a number of adjustments,we found that the Rt of the 12 wells calculated in this paper is basically close to the corresponding actual radius,which validates our *** results of this study provide a methodological basis for well pattern deployment in new gas storage construction.