咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Synergic Effect of Reworking f... 收藏

Synergic Effect of Reworking for Imperfect Quality Items with the Integration of Multi-Period Delay-in-Payment and Partial Backordering in Global Supply Chains

Synergic Effect of Reworking for Imperfect Quality Items with the Integration of Multi-Period Delay-in-Payment and Partial Backordering in Global Supply Chains

作     者:Waqas Ahmed Muhammad Moazzam Biswajit Sarkar Saif Ur Rehman Waqas Ahmed;Muhammad Moazzam;Biswajit Sarkar;Saif Ur Rehman

作者机构:Department of Operations and Supply ChainNUST Business SchoolNational University of Sciences and TechnologyIslamabad 44000Pakistan Department of Industrial EngineeringYonsei UniversitySeoul 03722Republic of Korea Department of Management ScienceLahore Garrison UniversityLahore 54660Pakistan 

出 版 物:《Engineering》 (工程(英文))

年 卷 期:2021年第7卷第2期

页      面:260-271页

核心收录:

学科分类:0810[工学-信息与通信工程] 12[管理学] 0830[工学-环境科学与工程(可授工学、理学、农学学位)] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 0808[工学-电气工程] 0817[工学-化学工程与技术] 0807[工学-动力工程及工程热物理] 0805[工学-材料科学与工程(可授工学、理学学位)] 0703[理学-化学] 0812[工学-计算机科学与技术(可授工学、理学学位)] 

主  题:Imperfect items Rework Shortages Multi-period delay-in-payments Non-derivative methodology 

摘      要:In intercontinental trade and economics goods are bought from a global *** occasion,the expected lot may include a fraction of defective *** imperfect items still have worth and can be sold to customers after *** is cost-effective and sustainable to rework such items in nearby repair workshops rather than return *** reworked items can be returned from the workshop to the buyer when shortages are equal to the quantity of imperfect *** the meantime,the supplier correspondingly deals a multi-period delay-in-payments strategy with *** entire profit has been maximized with paybacks for interim *** study aims to develop a synergic inventory model to get the most profit by making an allowance for reworking,multi-period delay-in-payments policy,and *** findings of the proposed model augment inventory management performance by monitoring cycle time as well as fraction of phase with optimistic inventory for a supply *** results demonstrate that profit is smaller if the permitted period given by supplier to buyer is equal to or greater than the cycle time,and profit is greater if the permitted period is smaller than the cycle *** algebraic method is engaged to make a closed system optimum *** mathematical experiment of this study is constructed to provide management insights and tangible practices.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分