咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Evaluation of boring machine p... 收藏

Evaluation of boring machine performance with special reference to geomechanical characteristics

Evaluation of boring machine performance with special reference to geomechanical characteristics

作     者:K. Goshtasbi M. Monjezi P. Tourgoli 

作者机构:Faculty of Engineering Tarbiat Modares University 

出 版 物:《International Journal of Minerals,Metallurgy and Materials》 (矿物冶金与材料学报(英文版))

年 卷 期:2009年第16卷第6期

页      面:615-619页

核心收录:

学科分类:080503[工学-材料加工工程] 08[工学] 0805[工学-材料科学与工程(可授工学、理学学位)] 0802[工学-机械工程] 080201[工学-机械制造及其自动化] 

主  题:performance prediction roadheader cutting rate specific energy tunnel boring machine penetration rate 

摘      要:The duration of tunneling projects mostly depends on the performance of boring machines. The performance of boring machines is a function of advance rate, which depends on the machine characterizations and geomechanical properties of rock mass. There were various theoretical and empirical models for estimating the advance rate. In this paper, after determining the geomechanical properties of rock mass encountered in the Isfahan metro tunnel, the performance of the roadheader and tunnel boring machine (TBM) were then evaluated using various models. The calculation results show that the average instantaneous cutting rate of the roadheader in sandstone and shale are 42.8 and 74.5 m^3/h respectively. However the actual values in practice are 34.2 and 51.3 m^3/h. The operational cutting rate of the roadheader in sandstone and shale are 8.2 and 9.7 m^3/h respectively, but the actual values are 6.5 and 6.7 m^3/h. The penetration rate of the TBM in shale is predicted to be 50-60 mm/round.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分